Assumption Parish Permit Requirements

Permit Office

Local area 084, Donaldsonville

Parish permit or inspection

Note:  If parish permit for new construction has a letter “A” in the permit # it is good for both the temporary meter and the permanent meter. A service location needs to be set up for both when this type permit is received. If the letter “T” is in the permit # then it is only good for the temporary meter

Local area 096, Labadieville

Parish permit or inspection

Exemptions:

openbook.gifSee Also:

Assumption Parish Directory

Belle River Permit Requirements

Belle Rose Permit Requirements

Belle Terre Permit Requirements

Brule Permit Requirements

Georgia Permit Requirements

Glenwood Permit Requirements

Half Way Permit Requirements

Klotzville Permit Requirements

Labadieville Permit Requirements

Napoleonville Permit Requirements

Paincourtville Permit Requirements

Pierre Part Permit Requirements

Plattenville Permit Requirements

Supreme Permit Requirements