Within town limits Permit Office
State Requirement
Before we can give clearance on a highway, waterway, for moving a house, etc. the state now requires a permit before the work can be done.
Special Instructions
Only licensed Electrician/Plumber may contact the permit office to receive a permit/approval. The customer is never to call the permit office
As of June 1992, the state of Louisiana has passed a law which states that “no permit is required to connect or re-connect a traffic signal light” located on state property i.e. highways, buildings, etc.
Electrical permit or inspection for one or more of the following:
Vacant longer than 12 months for both commercial and residential
New construction, temporary meter
New construction, permanent meter
Existing structure-if Entergy has to run a service line a permit is required
Fire
Mobile Homes: All turn ons, and installs; but not read and leave ons
Rewiring/increase in service
To have service restored after service has been disconnected for customer to do electrical repairs.
Each time a meter is removed from a fireworks stand
See Also: