Within town limits Permit Office
Electrical permit or inspection for one or more of the following:
New construction, temporary meter
New construction, permanent meter
Existing structure-if Entergy has to run a service line a permit is required
Commercial turn ons or name changes
Mobile home turn ons (inactive)
Mobile home meter sets
Within town limits & outside town limits
Note: If parish permit for new construction has a letter “A” in the permit # it is good for both the temporary meter and the permanent meter. A service location needs to be set up for both when this type permit is received. If the letter “T” is in the permit # then it is only good for the temporary meter
See Also: